Windows 7 Migration Plan Guide Using Lite Touch Deployment :Part 8 ( Master Machine Setup )
Install APP-V client
Due to all client will have this software there is no point in installing it after we can include it in our image also it super lite (below 100M) also this will deliver all our software from the cloud as soon as user first log on
We add our APP-V server
We change the load options so that our user can load applications into cache
Creating a task sequence to capture the OS
This sysprep and capture task
Select our OS (this is a dummy selection)
We go to our MDT distribution share under scripts and lunch litetouch.vbs
Select the image location
Downloading WinPE and sysprep
The Idea is to keep the size of the image very low as the duration need for the image transfer and deployment the machine is unusable
We import the newly created image into MDT workbench
The import is completed